Skip to start of page content

Lancashire County Council Logo | Listen | Home | A to Z | Feedback | Complaints | Your Council | Business | Residents | Visitors |

Local Transport Plan

LTP - F4: Use of LTP Integrated Transport block and maintenance funding


Scheme Type



Code


Unit of
Data


200304


200405


200506


200607


200708


200809


Bus priority schemes(excluding signalling)


quality bus corridor/showcase route schemes



BL1


number



1


1







BL2


km



8


20





busways/bus lanes



BL3


number




1







BL4


km




1





high occupancy vehicle (HOV) lanes



BL5


number










BL6


km








other bus priority schemes



BL7


number








Guided Bus Schemes


new guided bus scheme



BG1


number










BG2


km








Bus Infrastructure Schemes (excluding interchanges)


new bus stop



BI1


number



12






bus stops with travel information displays



BI2


number



95






improvements to existing bus stops



BI3


number


75


83


200





other bus infrastucture scheme



BI4


number








Light Rail (including tram and other rapid transit systems; excluding interchanges)


new light rail line (excluding line extensions)



LR1


number




1







LR2


km




18





light rail line improvements (including track dualling and line extensions)



LR3


number










LR4


km




19





additional capacity (vehicles)



LR5


number








other light rail schemes



LR6


number








Scheme Type



Code


Unit of
Data


200304


200405


200506


200607


200708


200809


Public Transport Interchanges


single mode interchanges


(new)


IN1


number









(improvement)


IN2


number



1


3





public transport interchanges at airports


new


IN3


number









(improvement)


IN4


number








multi-modal interchanges


(new)


IN5


number









(improvement)


IN6


number


1


1






new dynamic information systems at interchanges



IN7


number



1






Park and Ride


park and ride (bus/road related)


new schemes


PR1


number




1






extensions to existing
schemes


PR2


number








park and ride (rail related)


new schemes


PR3


number









extensions to existing
schemes


PR4


number








Cycling Schemes


cycle tracks



CY1


number




10







CY2


km


12


46


25





cycle lanes



CY3


number




5







CY4


km



17


10





new advanced stop lines



CY5


number




2





new cycle parking facilities



CY6


number


68


50


50





other cycling schemes



CY7


number








Scheme Type



Code


Unit of
Data


200304


200405


200506


200607


200708


200809


Walking Schemes


new or improved footways



WA1


number




10







WA2


metres



100


1500





pedestrianisation



WA3


number




1







WA4


metres








new or improved pedestrian/cycle bridge



WA5


number








other walking schemes



WA6


number


7







Travel Plans



local highway authority site travel plans



TP1


number








shire district travel plans



TP2


number




2





school travel plans



TP3


number


19


78






further/higher education establishment travel plans



TP4


number








hospital travel plans



TP5


number








employer travel plans



TP6


number


61


10


33





Local Safety Schemes


schools implementing first safe routes schemes



LS1


number


5


13


10





other sites implementing first 'safe routes' schemes



LS2


number








schemes which include new CCTV cameras



LS3


number








schemes which include new street lighting



LS4


number



16


10





other safety schemes



LS5


number


29


29


25





Road Crossings
toucan or puffin crossings
 
RC1
number

9



1





other signalled crossings
 
RC2
number


1


8





other unsignalled crossings
 
RC3
number







underpass replacement
 
RC4
number







Scheme Type



Code


Unit of
Data


200304


200405


200506


200607


200708


200809


Traffic Management and Traffic Calming (excluding CCTV cameras)


urban Traffic Control (instations)



TM1


number








signalling/signal upgrading (outstations)



TM2


number



6


18





other traffic management schemes



TM3


number








homezones



TM4


number


2



1





quiet lanes



TM5


number


4


26


8





clear zones/low emission zones



TM6


number








Urban 20mph zones



TM7


number


16


25


14





Rural 20mph zones



TM8


number








other urban traffic calming schemes (excluding home zones)



TM9


number








other rural traffic calming schemes (excluding quiet lanes)



TM10


number








Local Road Schemes (excluding trunk roads)


new rural bypasses



RD1


number










RD2


km








new relief road or urban ring road



RD3


number










RD4


km








new or improved access roads with specific regeneration or
social inclusion benefits



RD5


number










RD6


km








road dualling and widening schemes



RD7


number










RD8


km








road realignment schemes



RD9


number










RD10


metres








new junction or junction improvement schemes



RD11


number



2






other local road schemes



RD12


number








Scheme Type


 
Code
Unit of
Data
200304
200405
200506
200607
200708
200809
Miscellaneous
other schemes (using LTP Integrated Transport Block funding)
 

OS1


number








Maintenance Schemes


footway maintenance schemes
 

MM1


number



100


36





 
 

MM2


km



15000


118000





carriageway maintenance schemes
 

MM3


number



400


112





 
 

MM4


km


12


180


66





noise reducing road surfaces
 

MM5


number



150


56





 
 

MM6


km



50


50





strengthening to carry 40 tonne vehicular loading
 

MM7


number


119


13


180


305


330



structural maintenance & enhancement of existing highway structures
 

MM8


number



188


190


165


165



other schemes (using LTP capital maintenance funding)
 

MM9


70







  Printer Friendly Version | About our website | Top of page | Environment Directorate Copyright © 2009, Lancashire County Council | Site Terms What's New | Site Map | (External) Tell us what you think about our site...

Change Text Only Settings

Graphic version of this page